Completed client project. The 220-volt electrical service, propane wall-furnace heat, wood stove, separate wall and window cooling units, public water and engineered septic system set the limits for this kitchen, dining and living room remodel. The foundation type and water-heater type were not identified in the record, so we did not assume either could be changed. The two-story wood-frame house, built in 1987, measured about 2,260 square feet and had three bedrooms and two bathrooms, with the bedrooms and baths on the main level and a separate upstairs flex room. The county record supplied the recorded systems, while the documented room layout and finishes guided the design decisions. The house had a pitched composition-shingle roof, gray horizontal lap siding, an unfinished basement workshop and a rear deck with recently rebuilt Trex decking and metal railings. The project also refreshed the entry and hall and added seating and lighting to the deck, without changing the bedrooms, baths or upstairs flex room.
The photographs on this page are from the Designed & Curated portfolio and show finishes we have used on other projects. They are not photographs of this house.
The recorded systems shaped our decisions from the start. The distributed heating and cooling equipment meant there was no central forced-air system to extend into a newly connected space. We kept the work within the existing footprint, preserved the roof and left the public water and engineered septic system in place. The propane wall furnace, wood stove, fans, wall units and window units continued to serve the house's separate comfort zones.
The kitchen wall and the existing services
The owners wanted a clearer connection from the galley kitchen to the dining area under its vaulted ceiling, and onward to the living room beside the entry hall. The kitchen had green-painted wood cabinets, granite counters, a tiled backsplash and a double-basin sink beneath a window. We opened the framed separation at the dining end to improve the sightline, without changing the vaulted ceiling or the upstairs flex room. We kept the gas range on its existing exterior wall and retained the sink beneath the window. Keeping the sink in place respected the public-water and engineered-septic setup and avoided relocating the drain.
The kitchen already had a pantry cabinet, granite slab counters, a gas range, a refrigerator and a stainless-steel dishwasher. We refreshed the cabinetry in a lighter finish, updated the backsplash and brought the other kitchen appliances into a coordinated stainless-steel look. The 220-volt service remained a limit on electrical choices, so we kept the gas range rather than changing the kitchen to an electric cooking setup. We replaced the older hanging lights with task lighting at the counters and a dining fixture aligned with the table. The skylights and kitchen window continued to bring daylight into the work area.
The entry floor and the rooms around it
The entry and hall had carpet, the kitchen had light hardwood, and the main living areas had reclaimed wood flooring. Those changes in surface made the connection between the rooms feel less continuous than the layout allowed. We replaced the entry-hall carpet with wood flooring and coordinated the transition with the existing kitchen and living-area floors. The double-pane windows and large living-room picture window stayed in place. At the kitchen window, we replaced the patterned valance with a simpler light-filtering treatment, keeping the view of the mature pines and the natural light.
We kept the wood stove as the living room's focal point and arranged the seating so the route from the entry through the shared rooms stayed clear. Because the house relied on a wall furnace, the stove, fans and separate wall and window units, we kept the connected rooms within the reach of those existing comfort sources rather than treating them as if they had central air. The main-level bedrooms and baths stayed in their existing locations, and the upstairs flex room remained separate. The attached two-car garage retained its extra-deep storage area, while the front-porch ramp continued to provide the accessible entry.
The deck and the lighting check
The wooded lot and rear deck were already part of how the house connected to its surroundings. We kept the recently rebuilt Trex surface and metal railings, then added seating and discreet lighting so the deck remained useful after daylight. The low-maintenance yard and paved driveway stayed as they were, and we made no addition to the house footprint.
For the local energy check, we used the recorded Title 24 building climate zone 12 when selecting the new lighting, and kept the electrical work within the existing 220-volt service. The kitchen-to-dining opening, flooring and finish changes left the shingle roof, exterior footprint, water source and engineered septic system unchanged. We invited owners considering a similar project to get in touch.


