Completed client project. The owners of the house on Roosterfish Way in Florin came to us with a compact primary bathroom that felt dated and wanted it refreshed without making it less functional. The budget-setting choice was whether to move the sink for a different counter shape or keep it in place and put the money into the surfaces and lighting. Moving it could have changed the vanity layout, but would also have meant changing the drain and possibly the vent. We chose to keep the sink, toilet and tub where they were. Built in 2003, the two-story, 2,161-square-foot stucco house has a combination foundation, three bedrooms and two and a half baths.
The photographs on this page are from the Designed & Curated portfolio and show finishes we have used on other projects. They are not photographs of this house.
I began with the house's recorded room and construction details, then measured the bathroom on site. The primary bath had a single-sink oak vanity beside the toilet and a white acrylic tub with an integrated shower, with the door opening toward an adjacent bedroom. Keeping the fixtures in their existing positions preserved a straightforward arrangement; updating the vanity, counter and lighting offered a more useful change without a new drain route.
The upstairs bathroom and its existing drain
The bathroom is upstairs with the bedrooms, in keeping with the house's two-story layout and the record of three bedrooms and two baths on the upper level. The upstairs location and the combination foundation were part of the existing construction context, and the choice to retain the fixture positions kept the scope focused rather than introducing a new drain route. We measured the vanity and the clearances around the toilet and tub, and found that keeping the existing arrangement left the compact room usable.
The house has public water and public sewer, but those service facts did not establish the route or condition of the short branches serving this bathroom. Since we kept the fixture locations, the project did not include a new drain route through the floor or a relocated vent. The Sacramento County Water Agency provided water service in Florin, which we noted when tracing the service context for the project (Sacramento County Water Agency). The notes identified the Sacramento Regional County Sanitation District as the sewer service provider (Sacramento Regional County Sanitation District). Those connections stayed outside the scope because we left the bathroom layout intact.
The vanity, counter and beige floor
The existing beige laminate counter, oak cabinet, beige patterned vinyl and white ceramic fixtures made the room feel plain, even though its arrangement worked. We replaced the vanity with a cleaner, updated cabinet finish while keeping its footprint close to the original. We specified a solid-surface counter with room around the single basin for daily items, rather than adding another sink or shifting the plumbing. A framed mirror replaced the large frameless one, bringing definition to the wall without making the small room feel busier.
We removed the vinyl and installed ceramic tile, choosing a quiet, warm stone tone beside the white tub and toilet. We selected the tile, cabinet finish, counter and mirror together so the materials read as one decision rather than separate upgrades. The white-painted walls remained a calm backdrop, and the more durable floor and counter gave the bathroom surfaces that were easier to clean. The result kept the original compact layout but made the vanity area feel more considered and gave the owners a more useful stretch of counter.
Light at the mirror and tub
The white-framed window and its blinds brought daylight into the bathroom, but the room also needed better light after dark. We installed even lighting at the mirror for getting ready, along with a softer light layer near the tub. That gave the owners useful light at the vanity without relying on one bright fixture to serve the whole room. The large mirror had previously reflected the plain white walls and older finishes; the framed replacement gave the vanity wall a clear edge and worked with the updated cabinet and counter.
The house had forced-air heating and central air, and neither whole-house system was part of this bathroom project. We kept the scope focused on bathroom finishes and lighting, and retained the existing tub and shower combination. The finished room continued to work as a compact bath beside the bedroom, with the same familiar route between door, vanity, toilet and tub, but with brighter mirror light and more useful counter space.
The plumbing permit we checked
Sacramento County's plumbing guidance classifies relocating bathroom fixtures or altering drain or vent piping as plumbing permit work; this scope kept the sink, toilet and tub in their existing positions and did not include changes to their drain or vent piping (Sacramento County plumbing permit guidance). We also kept the work away from the building sewer lateral and its connection, so no sewer-connection alteration was included.
Get in touch with Amy to talk about your bathroom.