Completed client project. The owners came to us wanting a bathroom remodel that improved the room while respecting the house’s existing openings and layout. At N Terracina Drive, the house record names arched window recesses on the façade, but it does not specify the bathroom windows by count, type, room or condition. On site, we measured the bathroom openings individually and considered each one against the stucco exterior and the home’s arched details. The plan was a window-by-window decision: enlarge, replace, add or leave each opening. We left the existing openings in place and focused the work on the bathroom itself. The house details here draw on the home record and our on-site review. The two-story home was built in 2013, with about 4,063 square feet, six bedrooms and four and a half bathrooms on a 6,323-square-foot lot.
The photographs on this page are from the Designed & Curated portfolio and show finishes we have used on other projects. They are not photographs of this house.
The bathroom windows and stucco wall
We considered each bathroom opening separately rather than treating the room as a reason to redraw the façade. Keeping the openings in their existing size and location preserved the relationship between the bathroom and the exterior’s arched window details. We did not add an opening or enlarge one. Instead, we selected privacy treatments for the bathroom windows and coordinated their finish with the white trim and warm terra-cotta and beige stucco tones. The arched recesses remain a feature of the house, without being repeated unnecessarily inside the room.
The house’s two stories and stucco exterior informed the way we kept the bathroom work within the existing room. Its façade combines warm stucco tones and arched details, so a change to an exterior opening would have affected more than the bathroom’s interior. The windows stayed as they were, while the privacy treatment and surface selections brought the room into a considered relationship with the home’s existing character.
The fixture layout and shower surface
We measured the existing fixture positions before settling the bathroom layout, then kept the fixtures within that footprint. That kept the work focused on the room instead of relocating drains and supply lines without a clear benefit. The house has public water and public sewer, as well as a tankless water heater. We coordinated the bathroom fittings with those existing services. The home’s recorded heating is zoned and its cooling is central air; those are whole-house systems, not evidence of a separate bathroom heat source or exhaust arrangement.
We updated the bathroom’s surfaces and fittings as a coordinated finish, keeping the window treatment, wall surfaces and fixtures visually quiet beside the warm exterior palette. The house record lists hardwood, tile and carpet but does not assign those materials to particular rooms, so we selected the bathroom finish for the bathroom itself. For plumbing fixtures, we followed the applicable requirements rather than assuming a separate local water-conservation rule. The City of Dublin’s currently used codes included the 2025 California Plumbing Code, which set the fixture requirements that informed our selections.
The waterproofing sequence also shaped the shower finish. Dublin Municipal Code Section 7.40.030 describes testing work before it is covered. We sequenced the membrane and tile so testing took place before the finished surface concealed the waterproofing. The result kept the original window openings and fixture footprint while giving the bathroom updated surfaces and fittings.
The City of Dublin’s residential permit guidance classifies minor bathroom remodels without layout changes as over-the-counter permit work. We kept the bathroom layout unchanged and shaped the scope accordingly. Dublin Municipal Code Section 7.40.080 lists water piping in or under a concrete floor slab as permit work; this scope kept the plumbing arrangement in the existing footprint and did not route new water piping beneath a slab.